The completed plan checklist will be uploaded in place of the plan. The following documents are uploaded as supporting evidence and attached to the plan:
• PDF image of the plan memorial showing all of the necessary signatures and the deposit number
• Certificate of Approval (if required)
You can find more information on how to upload a plan in the eRegistration of Plans (Light) User Guide.